Installation of storage pallet racks


When our client buy the heavy duty racks from us, they will ask the installation guide of storage racks, below some tips for installation of pallet racks:

 

When to Consider Professional Installation

Consider hiring pallet racking installation professionals if you lack the necessary expertise, manpower, or equipment for safe installation. Professional installers will ensure that the installation is done correctly and complies with all safety standards.

 

Selecting a Reliable Installation Provider

Choose an experienced and reputable provider. Look for providers with positive reviews, a track record of safety, and adherence to industry standards. Ensure they are licensed and insured, and ask for references or case studies of their previous installations.

Effective pallet racking installation is a complex process that requires careful planning, adherence to safety standards, and regular maintenance. By following these detailed guidelines, you can ensure a safe, efficient, and compliant storage system in your facility.

sps20240627Installation-of-storage-pallet-racks

 

 

Step-by-Step Guide for Pallet Rack Installation

Assembling the Upright Frames

The installation begins with assembling the upright frames. Ensure that all components, like bracings and footplates, are correctly fitted. The frames must be vertical and stable before proceeding.

Laying out Your Pallet Racking System

Using the layout plan, mark the positions of the racks on the floor. Ensure sufficient space for aisles, forklift operation, and emergency exits. Accurate layout marking is crucial for efficient material flow and safety.

Installing the Beams

Carefully install the horizontal beams, ensuring they securely lock into the uprights. The beams should be level, and their spacing must accommodate the size of the pallets being stored. When installing beams, choose the correct gauge and size for load support, crucial for safety and durability. Carefully stage components and meticulously mark the floor for the starter bay to ensure precision in installation.

Completing the Installation

Once the frames and beams are in place, double-check all connections. Ensure that every part is tightly secured and the structure is stable. It’s essential to ensure that the storage racks are level and aligned correctly.